Back to Top
Home
Engineering Reports
Lab Report Format
Report Writing
Technical Report Writing
Sample Technical Report
July 11, 2025

Sample Technical Report


Structure:  Introduction → Methodology → Results → Discussion → Recommendations  → Conclusion Replacement of Soling with Interlocking Concrete Tiles for Campus Pathways   Prepared For:  Principal, Govt Graduate College Burewala Prepared By:  Civil Engineering Department Date:  28 October 2025 Location:  GGCB Main Campus (Phase I: Admin Block to Science Block Pathway) 1- Introduction Context: Existing gravel soling pathways at GGCB face recurring issues: Monsoon Damage:  70% erosion during July-August rains (2023–2024 data) Safety Hazards:  Uneven surfaces cause 3–5 slip incidents/month High Maintenance:  Annual repair cost: ₨350,000 for 1.2 km pathways Objective: Evaluate performance of interlocking concrete tiles (ICT) as a durable, low-maintenance alternative to soling. 2- Methodology Materials & Installation Component Specification ...
Read more

No comments